How To Build ATS Panels

In this e-book:

This handbook illustrates the basic steps to build a 40kVA 3-phase / 400V AMF panel adopting the most common changeover solution with two contactors. A brief comparison with motorized changeover is presented as well.

1.0 Contactors changeover

2.0 Motorized changeover

3.0 ATS panel specifications

4.0 ATS controller advantages in short

5.0 Popular ATS panel table sizes

6.0 ATS panel wiring diagram

7.0 Installing the ats controller on the door

8.0 Making the ats panel backplane

9.0 Installing contactors and cts

10.0 Auxiliary circuit breakers and terminal blocks

11.0 Installing the interface board and b.c.

12.0 Commencing the ATS panel wiring

12.1 wiring the generator’s circuits

12.2 wiring the mains’ circuits

12.3 wiring the kg driving circuits

12.4 wiring the km driving circuits

12.5 connecting the battery charger

12.6 mains voltage measurement connection

12.7 generator voltage measurement connection

12.8 current measurements

12.9 the contactor outputs

13.0 Battery and charger alternator

14.0 Interfacing the engine

15.0 The mandatory check-list before testing

16.0 Electrical ats panel test

17.0 Application note: dual generator

18.0 Application note: dual load

19.0 A final overview and conclusion